Paddington 2 Bed Flat – W2 UK Full Renovation

Description

Paddington 2 Bedroom Flat – W2 United Kingdom Full Renovation

 

This 2 bedroom flat is located in an 1860 building in Paddington. Our client wanted to bring this apartment up to date while preserving the original style and features of this period property. We installed a beautiful new kitchen and bathroom. Adding discrete storage throughout the flat for improved functionality.

 

Renovation works included:

  • We refurbished the original sash windows throughout the property. This included the complete replacement of sash locks, cords, pulleys and handles. Striping old paint, sanding and repainting original wooden frames
  • We installed feature ‘tray’ ceilings in the living and kitchen areas of the flat with recessed lighting
  • Our carpenter built spacious floor to ceiling wardrobes in both bedrooms with sliding doors and internal LED lights. We added a three-part closet in the guest bedroom which discreetly houses the boiler. This also allowed the TV to be hidden away in the centre. We left the third section free for clothing
  • Our clients requested more storage in the bathroom. So, we built storage space into the high bathroom ceiling. Plus, we added a built-in cupboard which held cleaning equipment. We painted all cupboards the same colour as the walls to create an ‘invisible’ effect
  • Install a stunning, modern, open-plan kitchen. We used glossy white units to bring a bright, spacious feel to the kitchen area
  • Equip throughout with top quality Bosch appliances
  • Add a breakfast bar area using a stunning grey granite work-top. We added a feature metalwork balustrade to create a visual break between the kitchen and living areas without limiting light flow
  • Install pop-up sockets
  • We added classic grey metro tile splashbacks and waterproof LED strip lights under the glass-fronted cabinets which created a super-stylish finish
  • Rewire entire property, including new fuse box
  • Replaster walls and ceilings throughout
  • We installed oak hardwood flooring
  • Carry out a complete bathroom renovation: installing new bath/shower, basin, toilet and heated towel rail. We tiled throughout with gorgeous grey tiles
  • And finally, we added marble countertops which give a stylish, high-end finish.

 

Take a look at the video below for a look around this stunning apartment.

 

Music: http://www.bensound.com

Share

© Copyright 2013-2018 Zorion Ltd. All Rights Reserved. v1.21